Rebates for solar panels at $1/watt DC plus REC payment up to 100kW for Black Hills customers. Pre-installation audit required.
Learn more about this energy rebate or
find a contractor
who knows about this rebate and will help you get started.
Black Hills Energy (formerly Aquila) has an On-Site Solar PV Rebate Program which provides incentives for its customers to install photovoltaic (PV) systems on their homes and facilities. In exchange for these incentives, Black Hills Energy earns the right to the renewable energy credits (RECs) associated with the PV-generated electricity for a period of time.
Incentives for customer-owned PV systems less than or equal to 3 kilowatts (kW) will be calculated as follows:
- An up-front rebate of $1 per DC watt; and
- Performance-based incentive (PBI) payments of $0.0945 per kilowatt-hour (kWh) of actual electricity production, paid annually for the first 9 years of operation
- An up-front rebate of $0.75 per DC watt up to $4,500; and
- PBI payments of $0.0945 per kWh of actual electricity production of first 6 kW*, paid annually for the first 9 years of operation.
- PBI payments of $0.1224 per kWh of actual electricity production, paid annually for the first 10 years of operation.
- PBI payments of $0.1080 per kWh of actual electricity production of first 6 kW*, paid annually for the first 10 years of operation.
- An up-front rebate of $0.25 per DC watt; and
- PBI payments of $0.2250 per kWh of actual electricity production, paid annually for the first 9 years of operation
- An up-front rebate of $0.23 per DC watt; and
- PBI payments of $0.2160 per kWh of actual electricity production, paid annually for the first 9 years of operation
- An up-front rebate of $0.20 per DC watt; and
- PBI payments of $0.2070 per kWh of actual electricity production, paid annually for the first 9 years of operation
* This is calculated using a ratio based on the actual system size compared to 6 kW. For example, a customer who installs a 10 kW system would receive a payment based on 6/10 of the electricity produced by the system.